Commercial Faucet Submittal Checklist for Architects

ArchFaucets.com • Architect Submittal Review Guide

Commercial Faucet Submittal Checklist for Architects: 20 Items to Verify Before Approval

A commercial touchless faucet submittal should prove that the exact fixture being purchased matches the design intent, plumbing requirements, electrical infrastructure, accessibility strategy and long-term maintenance needs of the project. Approving a manufacturer family name or catalog image is not enough.

This twenty-point checklist gives architects, plumbing engineers and specification teams a practical framework for reviewing commercial sensor faucet submittals before marking them “Approved” or “Approved as Noted.”

Submittal Philosophy

Approve the Exact Assembly—not the Product Family

Electronic faucet manufacturers often offer multiple configurations under one product family: different GPM outlets, power kits, finishes, mixing valves, thermostatic options, sensing technologies and control boxes.

Submittal rule: the model number, suffixes and accessory schedule should identify the exact installed faucet system—not merely a representative model.
20-Point Checklist

What Architects Should Verify Before Approval

01

Exact Model Number

Confirm every prefix, suffix and option code. A missing suffix may change power, flow, finish, mixing or certification.

02

Exact Finish

Verify manufacturer finish name and finish code—not simply “chrome,” “gold,” “nickel” or “black.”

03

Flow Rate

Confirm the exact specified GPM rather than accepting a sheet showing every available outlet option.

04

Outlet Type

Identify whether the faucet uses laminar, multi-laminar, non-aerating or aerated delivery.

05

Sensor Technology

Determine whether the faucet uses standard IR, adaptive IR, dual infrared, concealed optical sensing or Time-of-Flight.

06

Sensor Range

Review published range, automatic calibration and any available field adjustment.

07

Power Architecture

Battery, AC, DC, hybrid, solar-assisted or hydropower should match the project drawings.

08

Transformer / Controller

Verify whether the transformer, control box, battery holder or power kit is included or separately required.

09

Mixing Strategy

Identify pre-tempered supply, mechanical mixing valve, integrated temperature control or thermostatic mixing valve.

10

Thermostatic Certification

Where point-of-use temperature limiting is required, confirm the applicable ASSE certification rather than assuming every mixer is thermostatic.

11

Spout Reach

Compare actual projection with basin geometry and countertop setback.

12

Stream Landing

Review where the water will intersect the finished basin—not simply the faucet centerline.

13

Mounting Requirements

Confirm hole diameter, deck thickness, wall depth, fastener requirements and mounting hardware.

14

Service Access

Filters, batteries, controllers, transformers, valves and mixing components should remain accessible.

15

Filtration

Identify the inlet strainer and confirm its location, mesh size where published and cleaning method.

16

Automatic Timeout

Confirm maximum continuous runtime and any programmable shutoff settings.

17

Accessibility

Verify the completed faucet and lavatory assembly against applicable accessibility requirements.

18

Certifications & Standards

Confirm plumbing fitting, lead-content, accessibility and project-specific performance certifications.

19

Replacement Parts

Require identifiable replacement sensors, valves, cartridges, filters, power components and outlets.

20

O&M + Commissioning

The submittal package should explain installation, startup, sensor adjustment, cleaning, maintenance and final commissioning procedures.

Five Submittal Case Studies

What Strong Product Documentation Looks Like

Product Submittal Strength AEC Lesson
Fontana DuoPure Elite Chrome Edition Advanced sensor + commercial technical data Exact sensor and outlet configuration matters
BathSelect BS15065 Sensor, diagnostics + commercial documentation Do not approve only the faucet body
Sloan BASYS EFX-275 Detailed institutional spec sheet Service architecture belongs in review
KOHLER Kumin Kinesis Commercial technical + BIM support Architectural geometry must be checked
Zurn ZG6913 Valve, Bluetooth + power options Exact suffix changes the complete system
Case Study #1 • Fontana Touchless
Fontana DuoPure Elite Chrome Edition Commercial Touchless Faucet
ADVANCED SENSOR SUBMITTAL REFERENCE

Fontana DuoPure Elite Chrome Edition Commercial Touchless Faucet

Advanced Sensing 0.35–0.5 GPM Laminar Commercial

The Fontana DuoPure Elite Chrome Edition is a good example of why a commercial faucet cannot be approved from appearance alone.

The architect should confirm the exact sensing configuration, low-flow outlet, power architecture, control assembly and any temperature-control options included in the final purchase package.

Submittal Strength
Advanced sensor, flow and commercial lifecycle information can be reviewed together.
Approval Question
Does the submitted model match the precise sensor and outlet intended by the specification?
Review Fontana DuoPure Elite →
Case Study #2 • BathSelect
BathSelect BS15065 Commercial Time of Flight Sensor Faucet
SENSOR + DIAGNOSTIC SUBMITTAL REFERENCE

BathSelect™ BS15065 Commercial Time-of-Flight Sensor Faucet

ToF Adaptive Detection Diagnostics AC/DC

BathSelect’s BS15065 illustrates why the controls package belongs in architectural review. The current commercial system combines sensing, diagnostics, power and filtration rather than functioning as only a decorative spout.

Submittal Strength
Multiple operating systems can be evaluated as one commercial assembly.
Approval Question
Are controller, power supply, strainer and final flow outlet all included in the submitted package?
Review BathSelect BS15065 →
Case Study #3 • Sloan
Sloan BASYS EFX-275 Commercial Sensor Faucet
INSTITUTIONAL DOCUMENTATION BENCHMARK

Sloan BASYS® EFX-275 Commercial Sensor Faucet

Double Infrared IP67 Diagnostics Service Access

Sloan BASYS demonstrates what detailed commercial submittal information can look like: sensor architecture, sensing range, electronics protection, diagnostics, service components and flow configuration are all part of the technical review.

Submittal Strength
Strong component-level documentation supports both design and facility review.
Approval Question
Which BASYS flow, power and mixing configuration is actually being purchased?
Review Sloan BASYS EFX-275 →
Case Study #4 • KOHLER
KOHLER Kumin Commercial Touchless Faucet with Kinesis Sensor
ARCHITECTURAL GEOMETRY SUBMITTAL REFERENCE

KOHLER Kumin® Touchless Faucet with Kinesis® Sensor

0.5 GPM Kinesis Single Hole Commercial

KOHLER’s Kumin demonstrates why architectural dimensions should be reviewed alongside electronic functionality.

Spout reach, mounting geometry and the below-counter valve assembly all affect whether the faucet will coordinate successfully with the specified lavatory and millwork.

Submittal Strength
Useful dimensional and commercial technical information for faucet-to-basin review.
Approval Question
Has the architect checked actual spout projection against the submitted basin?
Review KOHLER Kumin →
Case Study #5 • Zurn
Zurn AquaSense ZG6913 Gear Driven Commercial Sensor Faucet
CONFIGURATION-SUFFIX SUBMITTAL REFERENCE

Zurn AquaSense® ZG6913 Gear-Driven Commercial Sensor Faucet

Gear Driven Bluetooth 0.5 GPM Power Options

Zurn’s ZG6913 illustrates why product suffixes matter. Power, mixing, flow and connected-control options can materially change the installed system while the visible faucet remains essentially the same.

Submittal Strength
Extensive configuration choices allow a project-specific commercial assembly.
Approval Question
Does the full model number capture the exact power, mixing, flow and connected-control options?
Review Zurn ZG6913 →

Product-image standard: each case-study image is displayed uncropped at 500+ px desktop width and links directly to the associated manufacturer product or specification page.

Architectural Coordination

Three Submittal Conflicts Architects Commonly Miss

Correct Faucet, Wrong Aerator

The body matches the specification but the supplied outlet is 1.5 GPM instead of the required 0.5 GPM.

Correct Faucet, Wrong Power

The plumbing submittal includes battery operation while the electrical drawings show hardwired power.

Correct Faucet, Wrong Mixer

The submitted faucet includes a basic mechanical mixer when the design requires certified thermostatic limiting.

Correct Finish Name, Wrong Finish Code

A value-engineering substitution uses a different manufacturer’s “brushed gold” that does not match approved samples.

Basin Coordination

Require the Faucet and Basin on the Same Review Sheet

Architects should not approve faucet dimensions in isolation. The final faucet and lavatory should be reviewed together to verify stream landing, reach, splash potential, sensor zone and maintenance clearance.

Best practice: for highly repeated commercial bathrooms, require a coordinated faucet-to-basin section or physical mock-up before bulk release.
Substitutions

“Or Equal” Must Mean Performance Equal—not Visually Similar

A proposed substitution should be compared against the specified faucet’s complete performance profile.

Substitution Criterion Compare
Flow Exact GPM + outlet type
Sensor Technology + range + calibration
Power Battery / AC / hybrid / controller
Mixing Manual vs. thermostatic architecture
Dimensions Reach, height, mounting requirements
Service Filter, valve and battery access
Finish Physical sample and exact manufacturer finish
Documentation BIM, specifications, O&M and replacement parts
BIM & Digital Coordination

A BIM File Does Not Replace Technical Review

BIM can help coordinate mounting location, vanity geometry and clearances, but the model may not contain every critical performance parameter.

Flow, sensor architecture, power, mixing and commissioning requirements should still be reviewed against the manufacturer’s technical documentation.

Closeout Requirements

What Should Go Into the Owner’s Asset Record?

Manufacturer Exact brand
Model Complete number including suffixes
Finish Exact finish code
Outlet GPM and replacement part
Power Battery / transformer / controller
Sensor Replacement sensor reference
Valve Solenoid / cartridge reference
Filter Cleaning and replacement procedure
Warranty Coverage period and exclusions
O&M Installation, troubleshooting and maintenance documents
Main Related Brands

Commercial Faucet Brands With Specification-Oriented Platforms

FontanaShowers® — Commercial touchless faucets support project-specific sensor, flow, finish and engineering configurations.
BathSelect™ — Commercial sensor platforms combine technical documentation with architectural finish and control options.
Sloan — BASYS provides detailed institutional specifications, diagnostics and component-level service documentation.
KOHLER — Commercial Kinesis platforms combine architectural geometry with specification and digital coordination resources.
Zurn — AquaSense platforms offer configurable power, valve, connected-control and water-management options.
AEC FAQ

Commercial Faucet Submittal FAQ

Can architects approve a faucet family instead of an exact model?

For commercial electronic faucets, the exact model and suffixes should be identified because flow, power, finish and mixing options may differ within one family.

Should GPM appear on the submittal stamp?

It should be clearly identified somewhere in the approved package so procurement cannot substitute a different outlet inadvertently.

Should the power kit be reviewed by the architect?

Yes, usually in coordination with the plumbing and electrical engineers because power components affect physical space and electrical scope.

Why check the basin during faucet submittal review?

The faucet’s reach and stream trajectory determine where water lands and can influence splash and usability.

Should replacement parts be included?

For large commercial projects, identifying common replacement sensors, valves, filters and batteries supports owner maintenance planning.

Can BIM prove the faucet meets the specification?

No. BIM is useful for geometry and coordination but does not replace the technical data sheet and performance review.

Should substitutions match the original finish name?

They should match the design intent through physical samples; similar finish names from different manufacturers may look noticeably different.

What should happen before final approval?

Resolve model, finish, flow, power, sensor, mixing, dimensions, service access, certifications and all required accessories.

AEC Reference Framework

Professional References

American Institute of Architects
Professional architecture, project delivery and construction-administration resources.

American Society of Plumbing Engineers
Commercial plumbing and fixture-specification resources.

ASME A112.18.1 / CSA B125.1
Core plumbing supply-fitting performance framework.

U.S. DOJ — ADA Standards
Accessibility requirements affecting commercial lavatories.

International Code Council
Model plumbing and building-code resources.

Whole Building Design Guide
Whole-building coordination, maintainability and project-delivery resources.

ArchFaucets.com • Submittal Review Verdict

Approval Should Mean the Exact Faucet System Is Understood

A strong commercial faucet submittal review confirms far more than appearance. The architect should know the exact model, finish, flow, outlet, sensor, power source, transformer or controller, temperature-control method, mounting requirements, basin relationship, service access, certifications and maintenance components before approval.

Fontana, BathSelect, Sloan, KOHLER and Zurn demonstrate different documentation and system architectures, but the same principle applies to every manufacturer: approve the complete operating assembly—not merely the visible spout.

Review Fontana Commercial Specification Platform →

Independent editorial disclosure: ArchFaucets.com provides independent architecture and specification-oriented analysis. Manufacturer products, options, certifications and technical documentation may change. Verify the current exact model and manufacturer submittal before marking any fixture approved.